Comprehensive training hall (indoor tennis hall)
About 1366 wordsAbout 5 min
2025-02-22

Comprehensive training hall (indoor tennis hall)
Baoan Comprehensive Training Hall (Indoor Tennis Hall) was completed and put into use in December 20...

Comprehensive training hall (indoor tennis hall)
Baoan Comprehensive Training Hall (Indoor Tennis Hall) was completed and put into use in December 20...
Basic Information
Park Overview
- Region: Baoan District
- Park Category: Sports venues
- Park Tags: To be updated
- Detailed Address: Intersection of Baoan Avenue and Luotian Road, Baoan District, Shenzhen
Park Introduction
Baoan Comprehensive Training Hall (Indoor Tennis Hall) was completed and put into use in December 2015, covering an area of 4,029 square meters, with one underground floor and three above-ground floors, a total construction area of 7,743 square meters, and a main body height of 20.625 meters. There are three indoor hard tennis courts and two children's short tennis courts. The indoor facilities include central air conditioning, changing rooms, hot showers and multiple functional rooms.
Opening Hours
- Park Opening Hours: 07:00-09:00,14:30-21:00
- Forest Area Opening Hours: No appointment required
Featured Attractions

Comprehensive training hall (indoor tennis hall)
Municipal Bureau of Culture, Radio, Television, Tourism and Sports
Baoan Comprehensive Training Hall (Indoor Tennis Hall) was completed and put into use in December 2015, covering an area of 4,029 square meters, with one underground floor and three above-ground floors, a total construction area of 7,743 square meters, and a main body height of 20.625 meters. There are three indoor hard tennis courts and two children's short tennis courts. The indoor facilities include central air conditioning, changing rooms, hot showers and multiple functional rooms.
- Highlights:To be updated
- Core Landscape:To be updated
- Design Features:To be updated
- Facilities:To be updated
- Functions:To be updated
- Suitable for Sports:To be updated

Comprehensive training hall (indoor tennis hall)
Municipal Bureau of Culture, Radio, Television, Tourism and Sports
Baoan Comprehensive Training Hall (Indoor Tennis Hall) was completed and put into use in December 2015, covering an area of 4,029 square meters, with one underground floor and three above-ground floors, a total construction area of 7,743 square meters, and a main body height of 20.625 meters. There are three indoor hard tennis courts and two children's short tennis courts. The indoor facilities include central air conditioning, changing rooms, hot showers and multiple functional rooms.
- Highlights:To be updated
- Core Landscape:To be updated
- Design Features:To be updated
- Facilities:To be updated
- Functions:To be updated
- Suitable for Sports:To be updated
Ticket Information
- Adult Ticket: free
- Child/Student Ticket: free
- Senior Ticket: free
- Discount Description: free
Transportation Guide
- Main Entrance: To be updated
- Secondary Entrance: To be updated
- Bus Stop: Buses B837, M350, M375, M470, M473; Metro Line 1
- Subway Station: To be updated
- Parking Lot Location: To be updated
- Whether Advance Reservation is Required: To be updated
- Parking Space Availability: To be updated
- Parking Fee: To be updated
Event Schedule
To be updated
To be updated
To be updated
Official Information and Contact Details
- Official Website: To be updated
- WeChat Official Account: To be updated
- Weibo: To be updated
- Other Social Media: To be updated
Facility Services
- Number of Public Restrooms:To be updated
- Public Restroom Facilities:
- Number of Water Dispensers:To be updated
- Water Dispenser Facilities:
- Number of Rest Areas:To be updated
- Rest Area Facilities:
- Number of Dining Services:To be updated
- Dining Service Facilities:
- Number of Children's Play Areas:To be updated
- Children's Play Area Facilities:
- Number of Bicycle Rentals:To be updated
- Bicycle Rental Facilities:
- Number of Camping Areas:To be updated
- Camping Area Facilities:
- Number of Picnic Areas:To be updated
- Picnic Area Facilities:
Friendly Reminder
- To be updated
- To be updated
- To be updated
Recommended Nearby Parks Scenic Spots, and Venues

Baoan Swimming Pool
To be updated | Jan 2, 2025
Baoan Swimming Pool was put into use in 2006, with a construction area of 25,000 square meters and a building height of 15.27 meters. The water area is 5,662.5 square meters, and the swimming pool has 1,200 seats for spectators. Baoan Swimming Pool has 1 competition standard pool, 1 training pool, 1 children's pool, and 2 children's play pools. Baoan Swimming Pool has 1 50-meter constant temperature standard competition pool with 10 lanes and 1 50-meter constant temperature training pool with 4 lanes. Baoan Swimming Pool was completed and put into use in September 2009, with a construction area of 21,100 square meters and a building height of 22.25 meters. The swimming pool has 3,000 seats for spectators, 6 seats for the disabled, 42 seats for the rostrum, and a total of 900 parking spaces. The swimming pool is divided into three floors, with two floors for the inner field. The first floor has a swimming pool as well as changing rooms, storage rooms, shower rooms, infirmary, competition function rooms, etc.; the second floor has office rooms, broadcasting function rooms, audio equipment rooms, etc.; the basement has water treatment and disinfection equipment rooms, air-conditioning equipment rooms, power distribution rooms and parking lots, etc.

Baoan Swimming Pool
To be updated | Jan 2, 2025
Baoan Swimming Pool was put into use in 2006, with a construction area of 25,000 square meters and a building height of 15.27 meters. The water area is 5,662.5 square meters, and the swimming pool has 1,200 seats for spectators. Baoan Swimming Pool has 1 competition standard pool, 1 training pool, 1 children's pool, and 2 children's play pools. Baoan Swimming Pool has 1 50-meter constant temperature standard competition pool with 10 lanes and 1 50-meter constant temperature training pool with 4 lanes. Baoan Swimming Pool was completed and put into use in September 2009, with a construction area of 21,100 square meters and a building height of 22.25 meters. The swimming pool has 3,000 seats for spectators, 6 seats for the disabled, 42 seats for the rostrum, and a total of 900 parking spaces. The swimming pool is divided into three floors, with two floors for the inner field. The first floor has a swimming pool as well as changing rooms, storage rooms, shower rooms, infirmary, competition function rooms, etc.; the second floor has office rooms, broadcasting function rooms, audio equipment rooms, etc.; the basement has water treatment and disinfection equipment rooms, air-conditioning equipment rooms, power distribution rooms and parking lots, etc.
Reference Data Source
Data Source and Update Time
| Serial Number | Data Tag | Data Source | Update Time |
|---|---|---|---|
| [1] | http://www.sz.gov.cn/szzt2010/szwtt/wtcg/tycg/content/post_11117341.html | Municipal Bureau of Culture, Radio, Television, Tourism and Sports | 2025-02-22 23:35:31 |
